DESCRIPTION
IKON’s scope included 200,000 sf slab on grade, 34,000 sf of paving, and 6,100 sf of sidewalks. FF 30/FL 20 requirements were exceeded.
Concrete Poured
240,000 sf
CITY, STATE
Pineville, LA
IKON’s scope included 200,000 sf slab on grade, 34,000 sf of paving, and 6,100 sf of sidewalks. FF 30/FL 20 requirements were exceeded.
Concrete Poured
240,000 sf
CITY, STATE
Pineville, LA