DESCRIPTION
Fourteen buildings for a women’s correctional institute. The scope of work included 270,000 square feet of slab on grade, 121,000 square feet of tilt up panels for 8 buildings, 190,000 square feet of elevated topping slabs, 65,000 square feet of concrete paving, and 65,000 square feet of sidewalks.
Concrete Poured
750,000 sf
CITY, STATE
St. Gabriel, LA